Skip to content
National SolarTechnology

Scheme guide

PM Surya Ghar – Odisha

An independent guide. Published assistance amounts checked: 3 November 2026 (published amounts only).
This company website is an information and enquiry service. Submitting our form does not submit a government application. Assistance depends on eligibility, current guidelines, compliant equipment, DISCOM verification and approval. No subsidy amount, zero bill, payment timeline or free units are guaranteed. Verify current official rules before relying on this guide.

Assistance schedule (residential)

Odisha's schedule provides ₹25,000 for each of the first two kW and ₹10,000 for the third. The January 2025 resolution specifies support through FY 2026–27 and subsumes the earlier Bhubaneswar Green City Mission subsidy — that older benefit is not added again.
Published residential assistance schedule. Amounts checked: 3 November 2026 (published amounts only). Source: MNRE, Rajya Sabha answer 465, 3 February 2026. Eligibility and availability must be confirmed on the official portal before applying.
CapacityCentral subsidyOdisha subsidyCombined assistance
1 kW₹30,000₹25,000₹55,000
2 kW₹60,000₹50,000₹1,10,000
3 kW₹78,000₹60,000₹1,38,000
Above 3 kWMaximum ₹78,000Maximum ₹60,000Maximum ₹1,38,000

Eligibility checks to confirm on the official portal

  • A valid residential electricity connection in the applicant's name.
  • A suitable roof with ownership or permission to install.
  • Disclose any existing solar system or previous subsidy. Confirm the rules for expansions or further assistance on the official portal.
  • Equipment meeting applicable requirements, including DCR modules and listed products where required.

Application journey

  1. 1

    Register on official portal

    Using your DISCOM and consumer number.

  2. 2

    Applicable approval

    Feasibility / approval as per current process.

  3. 3

    Choose eligible vendor

    Select a registered vendor for your area.

  4. 4

    Survey & quotation

    Site survey and written quotation.

  5. 5

    Installation

    With compliant equipment.

  6. 6

    Metering & commissioning

    Net meter, DISCOM inspection and commissioning.

  7. 7

    Subsidy submission

    Submit bank details on the portal and track status.

Common documents (subject to official confirmation)

  • Recent electricity bill
  • Identity proof as required by the portal
  • Roof ownership / permission proof
  • Bank account details (on the official portal only)
  • Photographs and commissioning documents

Financing

Banks may offer rooftop solar loans under the scheme. Terms, rates and eligibility are set by the lender — confirm directly.

Net metering

Net metering records energy imported from and exported to the grid; credit is applied per the currently adopted OERC regulations and DISCOM procedures. Rates, settlement periods and limits can change — confirm with your DISCOM.

Housing societies, RWAs and alternative models

Group housing societies / RWAs may be eligible for assistance for common facilities under separate rules. RESCO and utility-led models may also exist. Availability and conditions must be verified on the official portal before proceeding.

FAQs

CallGet Quote